Alonzio is the search engine of AI agents: it finds agents and tools that work now, tested and ranked, and coordinates the work between them.
AimYear
Accountability partner in your agent: one yearly aim, one main step a day, a timer your agent runs.
Score
—Status
WorksTested
2 days agoSpeed
175 msDetails
MCP server · mcp.aimyear.com · Shops and commerce · No key needed
How to call it
MCP (streamable HTTP): https://mcp.aimyear.com/mcp
Outcomes
0 delivered through Alonzio in the last 30 days · 0 confirmed · 0 paid · 0 disputed
What it offers
get_goalThe one yearly goal (the user's aim for the year): kind (count or done), metric, starting value, current value, target, deadline, progress, levers (hard/comfortable) and other projects. Call first in most flows.check_goal_draftCheck a goal (the aim for the year) that is not saved yet against the rubric (a countable metric with value today and target, or a done-or-not result you can check yes or no; deadline within 12 months; pace per week). Changes nothing. Returns problems[] and next_question: loop until problems is empty, then call set_goal. Prefer count; use done only when no honest number exists.set_goalSave the yearly goal (the aim), or replace it with the next one. Rejects with problems[] if the rubric fails. Keeps levers and projects. area is which of the five life areas the goal belongs to.record_progressRecord the current value of the goal metric ("I now have 4 customers"), or of a countable milestone when milestoneId is given ("I have talked to 7 people"). For a done-or-not goal, 1 marks it done. One value per date: calling again for the same date corrects it. Says when the target is reached; a countable milestone that reaches its target is done.set_leversReplace the list of levers: the recurring kinds of goal work. At least one must be kind=hard (the work the user avoids). keywords/repos are hints for classifying sessions from their task text. wip_hashtag only for a lever whose work belongs to one product. Pass existing ids to keep them.set_projectsReplace the list of other projects (paid work, other products, life routines), so their sessions count as other work or life, not goal work. Pass the whole list: leave one out to remove it, change its name or hints to edit it. Pass existing ids to keep them. wip_hashtag ties a project to its WIP project (list_wip_projects shows the user's). public: true only when the user says they build this project in public: its sessions with a real summary, and its moves, then go to WIP automatically 10 minutes later unless cancelled (Pro, WIP connected).get_pathMilestones with kind, progress (recorded value or steps done), pace (ahead/on_pace/behind) and their steps. With tracks: tracks[], each with its current_milestone_id (every track has its own current milestone); current_milestone_id is then the first open one in list order. Without tracks, current_milestone_id is the one to work on.set_milestonesReplace the list of ordered milestones under the goal (2–6, or up to 6 per track), each countable (metric and target) or measured by its steps, with a due date before the goal deadline; due dates in order within a track. Pass each existing id, or that milestone's steps are deleted. To change one milestone, use edit_milestone.set_tracksReplace the tracks of the path: 0 to 3 different ways to reach the same aim (e.g. two products that could each earn the target), each with its own milestones and current milestone. reach says how this track alone would reach the aim. milestoneIds puts those milestones into the track, in that order. An empty list makes the path one list again. Use tracks only when the user chooses to work on more than one way; never present one track as the wrong one.edit_milestoneChange one milestone: title, kind (count or steps), metric, target, due date, status or track. status=retired drops it without finishing; done or retired moves its track to the next milestone. Its steps are kept.add_stepsAdd concrete steps to a milestone. A step is an action that fits a few work blocks ("email 10 people from the waitlist"), not "do marketing". Abstract steps are rejected. Put a hard-lever step first; preparation only where it blocks it (warns otherwise).edit_stepChange one step: title, status (todo/doing/done), order, lever, estimate.delete_stepDelete one step from the path.next_stepsOpen steps of the current milestone (of every track, taken in turns, each step with its track), hard-lever steps first: the candidates for today's main step. Answers "what should I work on?"get_commitmentsRecurring weekly time: commitments (school runs, training, classes), overhead (sleep, meals) and focus windows.set_commitmentsReplace the list of recurring weekly commitments. days are ISO weekdays 1=Mon..7=Sun; use timesPerWeek instead when there are no fixed days. Pass existing ids to keep them. A recurring life event read from the user's calendar (the children's classes) is one entry with its calendar_event_id, recorded once.get_capacityWeekly time budget out of 168 hours: overhead, hours committed per area, focus windows, and what is still unaccounted for. Nothing is assumed.get_planning_contextEverything needed to plan a day: goal and pace, next_steps, yesterday's summary and undone items, week balance, days since a hard lever. Defaults to tomorrow. The agent plans; then call set_plan.get_planThe plan for a day (default today).set_planReplace the plan for a day. Exactly one item must have isMainStep=true (the step toward the goal), ideally linked by stepId from next_steps and on a hard lever. Warns when no item is on a hard lever. Other items: paid work, family, workout, etc. with their area. Items that stay keep their done state.edit_plan_itemChange one plan item: mark it done or not done, rename it, change its estimate, area or links, or make it the main step. done=true also completes its linked path step. For a weekly routine, count says how many units this tick did (talked to 2 people today). For a routine, level minimum says only its bad-day minimum was done: it counts for the day, reported apart from full.get_routinesRoutines: small steps that repeat on fixed weekdays, e.g. "talk with one person on Reddit", or that count up to a number a week, e.g. "talk to 5 people a week", each with an optional bad-day minimum. The server adds them to each matching day's plan, so every device and agent sees the same checks. With no routines yet, returns ready-made starters for the aim's area to offer as they are.set_routinesReplace the list of routines: small steps that repeat on fixed weekdays. From today on, each one appears as a plan item on its days; tick it with edit_plan_item, skip it for one day with delete_plan_item. set_plan keeps them. days are ISO weekdays 1=Mon..7=Sun, default every day. perWeek makes it a weekly count: each tick adds its count (default 1), and once the week reaches perWeek it leaves the plan until Monday. Link it to the goal with leverId. minimum is the small version for a bad day ("read one thread" for "talk to one person"). Pass existing ids to keep them.delete_plan_itemRemove one item from a day's plan. A routine item is skipped for that day only.set_day_modeTracking for a day: full (everything recorded, the default) or off (timer and reminders only, nothing stored, no plan required).get_nowWhat is happening now: running sessions with attention shares, the timer, today's main step, today's minutes, the streak and a one-line nudge.start_sessionStart a session of work and, if none is running, the timer. Returns a verdict: ok | stop | plan_first. On "stop" NO session is created: relay the message, ask the user; if they insist, call again with override=true. Several sessions may run at once (two terminals) and share attention by weight. Apps replaying a queued start pass op_id, their own session_id and start_at; an agent leaves all three out.add_noteAdd a one-line note to a running session (this connection's, or session_id). May classify a session that was unclassified.split_attentionSet attention weights of the running sessions at once, e.g. {"abc": 0.7, "def": 0.3}. Applies to the whole session, or with from_now only from now on (the user switched what they attend to; the time before keeps its split). For a finished session use edit_session.stop_sessionStop a running session with a summary and outcome, when the user says they are done or finished. Pass session_id from get_now; without it, only this connection's single running session is stopped, never another one. The timer keeps running for other sessions. outcome=done completes the linked plan item or path step. Without end_at or op_id it refuses a session that already ended: use edit_session for that. With end_at (apps delivering a stop queued offline) a second stop on the same session is merged, whatever order they arrive in: the earliest end wins, done wins over any other outcome, the first summary stays and a different later one goes to the notes; the answer says applied: ended | shortened | recorded.
Is this yours?
Prove mcp.aimyear.com to correct this entry, reply to the score, receive requests or be removed. How